Project Overview

The development of the GIS substation building in Clifton, New Jersey marks a major step forward in power infrastructure. This project enabled the power utility company to build functional substations in a crucial location, overcoming both space limitations and aesthetic concerns. Collaborating closely with the client, we designed a structure that adheres to industry safety standards. The use of precast concrete provided the required durability, while the brick finish added to its visual appeal.

Project Details

  • Market: Energy
  • Total Number of Precast Pieces: 94
  • Number of Erection Days: 11
  • Building Total SQ FT: 15,500
Precast Materials Used
  • Insulated Wall Panels
  • Architectural Wall Panels