Project Overview

A family connected Northeast Precast to build the foundation of their dream home. They had heard about Superior Walls by Northeast Precast through their excavator contractor. The family took on the role of General Contractors for the project. 

Superior Walls was an obvious choice, as the isometric CAD drawings eliminated any uncertainty about the final product's appearance. Drafters and the Sales Representative addressed all questions regarding support ledges, point loads, and outdoor steps, communicating effectively with the family and their architect/engineer. As is standard for all projects, Superior Walls obtained the necessary seals from the In-House Architect. 

Once production was complete, the installation team arrived on time, and within 8 hours, the project was finished. The next phase, which involved framing the floor joists and pouring the basement floor, could begin immediately.

Project Details

  • Foundation Level:283 LF of 9' Xi Panel Superior Wall Panels
    • 104 LF of 4' Xi Panel Superior Wall Panels
    • 3 DUO 32 x 16 Precast Window
    • 33 Galvanized Bracket (Support Ledge) 
    • 1"D" Size Quick Set Steps
  • Total Production Time: 1 Day
  • Total Erection Time: 1 Day at 8-9 Hours/Day